Steam solenoid valve installation note 10 items

1. Before installing the solenoid valve, the pipe must be cleaned. It is recommended to install a filter in front of the valve and a steam pipe to install the trap.

2. In the pipeline system, the diameter of the solenoid valve installed on the branch road should be smaller than the diameter of the main pipeline valve.

3. When the solenoid valve is faulty, in order to isolate the solenoid valve in time and ensure the normal operation of the system, it is better to install the bypass device.

4. The working medium of the solenoid valve should be clean and free of particulate impurities. The dirt and filter on the surface of the solenoid valve internal parts should be cleaned regularly.

5. When installing, the solenoid valve coil is upward and maintains the vertical position. The arrow or mark on the solenoid valve should be consistent with the flow direction of the pipeline, and should not be installed in places with splashing water or water leakage.

6. The valve cannot be installed in the low recess of the pipeline to prevent the condensation of steam, impurities and the like from being deposited in the valve.

7, can not be used in explosive places.

8. In the case of insufficient rigidity of the pipeline, it is recommended to fix the pipe in front of the valve with a bracket to avoid vibration caused by the solenoid valve working.

9. Before installation, pay attention to see the product label, read the instruction manual carefully, and judge whether the product meets the conditions of use.

10. A pressure gauge should be installed on the pipe before and after the solenoid valve to observe the pipe pressure.